Application – public – non CoCT

    Fields marked with * are required

    SITE INFORMATION

    Project Name *

    Property ERF Number *

    Physical Address of System *

    Suburb *

    Town/City *

    Province *

    Postal Code *


    CUSTOMER & INSTALLER DETAILS

    CUSTOMER

    Name of Customer *

    Electricity Account Number of Customer *

    Customer Address *

    Customer Suburb *

    Customer Town/City *

    Customer Province *

    Customer Postal code *

    Customer Cell Phone Number *

    Customer Email Address *

    ID or Passport Number of customer *

    INSTALLER

    Installer's Company Name *

    Company Registration Number *

    Installer Physical Address *

    Installer Town/City *

    Installer Province *

    Installer Postal code *

    First Name of Installer Representative *

    Surname of Installer Representative *

    Installer Cell Phone Number *

    Installer Email Address *


    EXISTING CONNECTION

    Type of Account of existing connection *
    ResidentialCommercial (including bulk residential)IndustrialAgricultural

    Current rating of existing main switch in Amps *
    20A30A40A50A60A70A80A90A100A110A120A

    Number of phases of existing main switch *
    Single PhaseThree Phase

    Notified Maximum Demand (NMD) - for commercial/industrial properties

    Customer Supply Voltage *
    Low VoltageMedium VoltageHigh Voltage

    Average electricity consumption in kWh/month (before EG system installation) *


    SYSTEM DETAILS

    General System Information

    Solar PV Category *
    RooftopGround mountedBuilding integrated

    If solar PV: Total PV panel (nameplate) capacity (kWp)
    :

    Total system/inverter capacity *

    Number of phases of System *
    Single PhaseThree Phase

    Voltage of generator connection into customer's network *
    LVMV

    Power Factor *

    Type of Energy Conversion *
    Static Inverter

    Earthing Arrangements *
    TN-STN-C-S

    Inverters

    Manufacturer *

    Model (please supply exact model #) *

    Capacity *

    Export & Storage

    Export
    Grid Connection mode *
    No ExportYes (will export)

    Storage
    Does the system include storage capabilities? *
    No storageYes (but only as standby power)Yes (connected in parallel to the system)

    Storage capacity in kWh *

    Maximum charging current (AC) *

    Method of control of max charging current *
    Current limited by installation of a circuit breakerCurrent limited by password protected inverter settingCurrent limited by inverter setting

    Estimated Generation Levels

    Your estimated monthly output of system in kWh *


    REGULATIONS & STANDARDS



    Does the Rooftop Solar PV system require approval by Municipality's planning department? *
    YesNo


    CONSTRUCTION DETAILS

    Is this system already installed *
    YesNo

    If No, what is your anticipated construction start date?

    What is your anticipated construction finish date?


    DECLARATIONS


    PHOTOS/IMAGES/ATTACHMENTS

    Upload ID Document or Passport of Owner *

    Drawing of SSEG installation (must consist of circuit breaker/wire sizes for all components of installation) *

    SANS 10142-1-2 Certificate of Compliance *

    New SSEG test report for PV *

    Inverter certificate *

    Municipal account of Property *

    Photo of the SSEG installation (1 of 2) *

    Photo of the SSEG installation (2 of 2) *


    ADDITIONAL NOTES

    Any additional notes


    Supporting Documentation